|
Still deciding? Get samples of $ !
Request Sample
|
| Customization: | Available |
|---|---|
| After-sales Service: | Professional Guidance |
| Warranty: | Professional Guidance |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1. Converter Steelmaking
1) Converter tilting: Molten steel slag is discharged and collected in slag pots;
2) Transport to hot-pouring slag yard: Slag is dumped and cooled via water spraying;
3) Magnetic separation: Residual steel is recovered from the slag; processed steel slag is used for roadbeds and construction material feedstock.
2. Ironmaking Blast Furnace
Receives molten blast furnace slag (1300-1450°C) and transports it via overhead crane and rail to the slag yard:
1) Water granulation: Slag is granulated for use as cement raw material;
2) Dry slag stockpiling: Slag is stored for subsequent processing into construction materials.
3. Electric Arc Furnace (EAF) & Refining Furnace
1) Slag discharge from EAF steelmaking;
2) Desulfurization slag from LF (Ladle Furnace) refining;
3) Residual slag from continuous casting ladles (molten slag remaining at the bottom of the ladle); all are collected in slag pots and transported.
| Nominal capacity (m³) | Tank dead weight (t) | Top opening diameter (mm) | Total height (mm) | Trunnion center-to-center distance (mm) | Bottom wall thickness (mm) | Top opening wall thickness (mm) |
| 8 | 18-21 | 3800 | 2450 | 3200 | 110-130 | 85-100 |
| 11 | 22-25 | 4200 | 2700 | 3600 | 120-140 | 90-105 |
| 13 | 24-28 | 4400 | 2850 | 3900 | 125-145 | 95-110 |
| 16 | 28-32 | 4700 | 3000 | 4200 | 130-150 | 100-115 |
| 20 | 33-38 | 5000 | 3200 | 4600 | 135-155 | 105-120 |
| 25 | 42-48 | 5300 | 3400 | 5000 | 140-160 | 110-125 |
| 30 | 52-58 | 5600 | 3550 | 5300 | 145-165 | 115-130 |
| 36 | 62-68 | 5900 | 3730 | 5600 | 150-170 | 120-135 |
| Grade / Designation | Yield Strength ReH (MPa) | Tensile Strength Rm (MPa) | Elongation A (%) | Reduction of Area Z (%) | Impact Energy AKV (J) |
| ZG230-450 | ≥230 | ≥450 | ≥22 | ≥32 | ≥25 |
| ZG270-500 | ≥270 | ≥500 | ≥18 | ≥25 | ≥22 |
1. High-temperature liquid slag discharges from the furnace mouth into a slag pot;
2. An overhead crane lifts the slag pot, and a rail transfer car transports it;
3. It is transported to the slag processing workshop or slag yard;
4. The overhead crane tilts the slag pot to dump out the red-hot molten slag (using methods such as hot pouring, water spraying for cooling, or water quenching);
5.After cooling, the empty slag pot is returned to the furnace area for reuse.